Yes, most structural foundation work, repiling, or house propping for a basement conversion in Auckland requires a building consent from the Auckland Council. Re-leveling and maintenance work can sometimes fall under exempt building work, but we will assess your specific property during our consultation and help guide you through the entire engineering and consent process seamlessly.
In the vast majority of cases, yes, you can remain comfortably at home. For standard repiling, leveling, and basement propping, we work entirely beneath your floorboards or outside the home. We only request temporary relocation if we are lifting the house significantly or if utility disconnections (like water and waste) will take longer than a single working day.
Every home in Auckland is unique, but a standard house re-leveling or partial repiling typically takes between 5 to 10 working days. Larger projects, such as site shifting or installing foundations for basement conversions, can take several weeks depending on engineering complexity and weather conditions.
Common warning signs include doors or windows sticking and jamming, sloping or bouncing floors, interior drywall cracking, gaps appearing between your skirting boards and the floor, or a damp, musty smell rising from your subfloor crawlspace. If you notice any of these issues, it is best to get a professional inspection early.